An approaching storm could delay NASA’s moon rocket launch attempt


An approaching storm could delay NASA's moon rocket launch attempt

NASA’s Moon rocket stands on Pad 39B before attempting to launch the Artemis 1 lunar orbit mission at the Kennedy Space Center, Friday, Sept. 2, 2022, in Cape Canaveral, Florida. On Friday, September 23, 2022, a storm in the Caribbean threatens to delay NASA’s third rocket launch attempt. Credit: AP Photo/Brynn Anderson, File

An approaching storm threatens to delay NASA’s next attempt to launch its new lunar rocket, which has already been stalled for weeks due to a fuel leak.


a tropical depression In the southern Caribbean, it’s heading towards Florida and could become big hurricane.

Managers announced Friday that the rocket is now ready to launch on its first test flight, after overcoming further hydrogen leakage during a refueling test earlier in the week. This will be the first time a crew capsule has orbited the Moon in 50 years; The spacecraft will carry mannequins but not astronauts.

Teams will continue to monitor forecasts and decide no later than Saturday whether to not only delay the test flight, but also pull the missile off the platform and back into the hangar. It’s not clear when the next launch attempt will be – whether in October or even November – if the rocket should seek refuge inside.

Preference is to stay in launcher “But there are still some uncertainties in the outlook,” said Tom Whitemaier of NASA, associate deputy administrator for exploration systems, and the launch attempt on Tuesday.

It takes three days of preparations to return the rocket to the Kennedy Space Center’s Giant Vehicle Assembly Building, a 4-mile (6.4 km) journey that takes several hours.

“I don’t think we’re going to cut it any close,” Whitmire told reporters. “We just take a step at a time.”

The 322-foot (98 m) rocket can withstand wind gusts of up to 85 mph (137 km/h) at the platform, but only 46 mph (74 km/h) once in motion.

This will be the third attempt to launch the Space Launch System rocket, the most powerful rocket NASA has ever made. fuel leaks, etc technical problems She canceled her first two attempts, in late August and early September.

despite hydrogen fuel After leaking newly installed seals during Wednesday’s rehearsal, the launch team was able to reduce the leak to acceptable levels by slowing the flow and reducing pressure in the lines. That gave the launch team confidence to go ahead with Tuesday’s launch attempt, officials said.

Administrators said the 30-year space shuttle program has also seen plenty of hydrogen fuel leaks and hurricane-related declines. The main engines of the moon rocket are actually upgraded versions of what flew on the shuttles.

Also, the Space Force has expanded certification of on-board batteries that are part of the flight safety system — at least until the beginning of October.

NASA has only two chances to launch RocketTuesday, October 2 – before the two-week blackout begins. The next launch period will open on October 17th.

Astronauts will board it for the second time test trip Around the Moon in 2024. The third mission, targeted for 2025, will see a pair of astronauts land on the Moon.


NASA’s Moon Rocket Fuel in Test, Hit Again With Disturbing Leaks


© 2022 Associated Press. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed without permission.

the quote: An Approaching Storm Could Delay NASA’s Moon Rocket Launch (2022, Sep 23) Retrieved Sep 23, 2022 from https://phys.org/news/2022-09-approaching-storm-nasa-moon-rocket.html

This document is subject to copyright. Notwithstanding any fair dealing for the purpose of private study or research, no part may be reproduced without written permission. The content is provided for informational purposes only.





Source link

Related Posts

Precaliga